Mangrul Dist Jalna (Maharashtra) |
13093.00 |
370 m. long Concrete Barrage with 21 Nos. of 15 X 5.30 m size Vertical Lift Gates. Quantities of Major Items (153000 Cum) Reinforcement Steel (1620 MT), Structural Steel (3003 MT) and Pre-stressed Bridge (21 Nos. of 16.50 m. spans).
The work completed 1 year before the stipulated time of 4 years. |
Roshanpuri Dist Beed (Maharashtra) |
8885.59 |
170 m long concrete barrage with 10 Vertical lift gates of 12 X 7 m size |
Chandas Wathoda Dist Amravati (Maharashtra) |
5302.00 |
3300 m long Earth Dam (19080000 cum Earth Embankment), Feeder Canel of Km length (1016000 Cum Excavation and Diversion Barrage (30000 Cum Concrete) |
Dhule (Maharashtra) |
2200.00 |
Concrete Pick Up Weir (120 m long), 14 Km Main Canal with 4 nos. Enroute Reservoirs, 30 Km Disnet and Tail Tank (800000 Cum Earthwork) |
Nizamsager (Andhra Pradesh) |
10200.00 |
Modernization of Main Canal and Disnet (40 Km) |
Nagan Medium Project Dist. Nandurbar. (Maharashtra) |
2682.00 |
1045 m. long earth dam with 538000 cum excavation and 1263900 earthen embankments. |
Kothale Dist Ahemdnager (Maharashtra) |
1038.67 |
Earth dam of 43.50 m height. The work completed in record time of 5 months. |
Dehri (Madhya Pradesh) |
540.00 |
2400 m. long Earth Dam, 8 Km Main Canal and Disnet work for 1200 Ha. |
Jawahar Lift Irrigation Project (Nettampadu LIS) Package No.98- Investigation, Design, Estimation of E.W.E. of Approach Chanel and Formation of Reservoir near Gudemdoddi village of Mahbubnagr District (Andhra Pradesh) |
6250.00 |
2.80 Km long Approach Channel with deep cut of 42 m and excavation of 1800000 cum. Earthen dam of 3.80 Km length with 2400000 Cum earth work. |
Earthwork Tunnel Aurangabad (Maharashtra) |
369.08 |
Excavation in deep cut of 17 m. 200 m long Tunnel. |
R.B. Canal Km 6 to 10 & Disnet of Manikpunj Project Dist Nashik (Maharashtra) |
544.03 |
Main canal of 5 Km and Disnet of 72 Km length. |